Inicio / Projects / LYCÉE FRANCO-ALLEMAND DE BUC

LYCÉE FRANCO-ALLEMAND DE BUC

Buc

LYCÉE FRANCO-ALLEMAND DE BUC

Work:

CONSTRUCTION OF 5 PARASOLS FOR THE FRANCO-GERMAN INSTITUTE OF BUC (FRANCE)

Builder:

S.A.S. EIFFAGE CONSTRUCTION HABITAT

Tissue:

ETFE monocapa

Location:

Buc

Surface:

645 m2

Year:

2021

Architect:

BEHNISCH ARCHITEKTEN & ATELIER 2A+

Measures:

5 trapezoidal section parasols up to 15.6m in average length and 14.3m in average width

Client:

S.A.S. EIFFAGE CONSTRUCTION HABITAT

Prime contractor:

CONSEIL DEPARTEMENTAL DES YVELINES

Material

ETFE Film

System

Covers and Façades in ETFE single-layer

Use

Infrastructure and equipment

Description LYCÉE FRANCO-ALLEMAND DE BUC

As part of the restructuring and extension project of the Franco-German institute in Buc, 5 separate inverted parasols are incorporated to protect the students from the sun and the weather.

Each of the 5 parasol is composed of 4 triangular ETFE single-layer membranes arranged in succession to give rise to a trapezoidal plan geometry in which the vertices of the 4 triangular membranes meet at the central post of the supporting metal structure. The altimetry of the outer perimeter of each sunshade is constant, while the central post is at a lower level so that the rainwater collected by the membranes can drain inside it, thus creating an inverted sunshade configuration.

The parasols are distributed throughout the playground, covering a total area of 635m2.

Technical Base

This work has been carried out with the single-layer ETFE system, 250 microns thick, screen-printed with a design of aluminium-coloured dots and 4.2mm diameter over 65% of the surface according to the light transmission and solar factor criteria imposed.

Each of the ETFE membranes is fixed on its perimeter to the metal support structure by means of a semi-rectangular aluminium profile that allows the membrane tensioning system to be concealed inside. The membranes are in turn reinforced by stainless steel cables, anchored to the metal structure with a system of staples and brackets.

Between the triangular membranes of each sunshade, waterproofing membranes have been installed integrated into the profiling, which channel the rainwater into the channels between the membranes that converge at the central drainage post located at the lowest point.