This project is a global reform of the 2 roofs of the park to improve the thermal efficiency of the park. To this end, the insulation of the roof between the 2 buildings has been improved, all the air conditioning has been changed and the 3-layer cushions have been replaced by 5-layer ones with a thermal bridge breaker profile.
Technical Base
5-layer ETFE cushions have been installed on top of the existing structure and without having to replace the base aluminium profile.
Of the 5 sheets, the 2 outer ones have silk screen printing to achieve the customer's target FS.
In addition, the base profile has not had to be replaced but has been improved to eliminate the thermal bridge that existed on the periphery of the cushions.
With this intervention, the U of the system has been improved to 2.7 W/(m2. K) at 1.1 W/(m2. K).
At IASO we use our own and third-party cookies for analytical and advertising purposes. You can accept all cookies, reject them or configure your preferences, by clicking here where you can obtain more information.
Necessary cookies help make a web page usable by activating basic functions such as page navigation and access to secure areas of the web page. The website cannot function properly without these cookies.
Statistical cookies help web page owners understand how visitors interact with web pages by collecting and providing information anonymously.
Preference cookies allow the website to remember information that changes the way the page behaves or the way it looks, such as your preferred language or the region in which you are located.
Marketing cookies are used to track visitors on web pages. The intention is to show ads relevant and attractive to the individual user, and therefore more valuable to publishers and third-party advertisers.